Confirm the selected model, finish, required components and project stage before releasing procurement or delivery. Keep early rough-in requirements distinct from later finish items while preserving their relationship. The acceptance scenario should prove that a selection revision prompts the right review rather than silently changing material that has already been purchased or supplied.
Understand the decision
A customer changes a visible fixture after its concealed component has reached the site. Sales sees a design change, while purchasing and the contractor need a compatibility decision. Use that situation to test how a confirmed selection, supplier commitment and delivered material remain connected and understandable.
Work through the requirements
- Capture the complete approved selection
- Separate releases by required project stage
- Review revisions against purchased components
| Record or decision | Why it matters |
|---|---|
| Selection approval | Identifies model finish and components |
| Stage release | Defines rough-in or finish delivery |
| Revision impact note | Records consequences for existing commitments |
What would a passing test show?
Use these hypothetical cases in a demonstration. Mark the evidence you have reviewed, then download the checklist. Selections stay in this tab.
Watch for this failure
A new showroom description should not overwrite the component history of an active installation. Keep the original selection and its revisions accessible so technical and commercial decisions can be made with the actual supplied material in view.
Continue the evaluation
This example defines what to verify, rather than promising a particular Odoo feature. Keep a record of the demonstrated result, configuration, unresolved gaps and person who accepts it.
Read the wider implementation guideBring your workflow to the conversation.
Discuss requirements for Plumbing distribution in a business needs review. Start with your current systems, the handoff that fails and the result you need to prove.
Sources & scope
The linked product documentation is a starting point for validating your chosen version, edition, apps and hosting. The scenarios and acceptance criteria are editorial planning guidance, not customer case studies or a guarantee of built-in functionality. See how this library is prepared.
Import vendor pricelists ↗Units of measure ↗Packaging ↗